沪江

SAT I 一日一问:2014年1月29日

2014-01-29 10:00
本文支持点词翻译 Powered by 沪江小D

The correct answer is D

Explanation

Machine X, working at a constant rate, can produce x bolts per hour, and machine Y, working at a constant rate, can produce x plus 6 bolts per hour. Therefore, in one hour, both machines working together at their respective rates can produce x plus x plus 6 equals (2 x) +6 bolts. It follows that in 4 hours, both machines working together at their respective rates can produce 4 ((2x) +6) equals (8 x) +24 bolts.

展开剩余